Ets-lindgren 2110 Multi-Axis Positioning Systems (MAPS) Bedienungsanleitung Seite 30

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken
  • Seite
    / 48
  • Inhaltsverzeichnis
  • LESEZEICHEN
  • Bewertet. / 5. Basierend auf Kundenbewertungen
Seitenansicht 29
30 | Installation
Position the actuating pins on each side of the limit switch access port
9. Verify the access port is located over the limit switch.
10. Position the actuating pins in the holes on each side of the access port.
Controller Interface
For information about connecting fiber optic cables from the MAPS to the
Model 2090 Multi-Device Controller (or next generation ETS-Lindgren controller,
if applicable), see the controller manual.
Electrical Interface
Electrical installation must be performed by a qualified
electrician, and in accordance with local and national electrical
standards.
Only qualified personnel may install the electrical interface
from the chamber to the MAPS.
Seitenansicht 29
1 2 ... 25 26 27 28 29 30 31 32 33 34 35 ... 47 48

Kommentare zu diesen Handbüchern

Keine Kommentare