Ets-lindgren 2171B Boresight Antenna Tower Bedienungsanleitung

Stöbern Sie online oder laden Sie Bedienungsanleitung nach Ausrüstung Ets-lindgren 2171B Boresight Antenna Tower herunter. ETS-Lindgren 2171B Boresight Antenna Tower User Manual Benutzerhandbuch

  • Herunterladen
  • Zu meinen Handbüchern hinzufügen
  • Drucken

Inhaltsverzeichnis

Seite 1 - User Manual

Model 2171B / 2170B Antenna Positioning Tower User Manual Model 2171B boresight

Seite 2

10 | Introduction ETS-Lindgren Patented Boresight System The Model 2171B provides the ETS-Lindgren patented boresight system to provide direct

Seite 3 - Table of Contents

Introduction | 11 NON-BORESIGHT FUNCTION Positioning Controller (Required) A positioning controller, such as the ETS-Lindgren EMCenter™ Modular R

Seite 4

12 | Introduction  Fiber Optic Control Cables: 3- and 10-meter  Fiber Optic Shield Room Penetration Kit: Routes the fiber optic control cab

Seite 5 -

Maintenance | 13 2.0 Maintenance Before performing any maintenance, follow the safety information in the ETS-Lindgren Product Information Bull

Seite 6

14 | Maintenance Maintenance Schedule EVERY THREE MONTHS  Inspect belt for wear, tension, and cracking.  Check all screws and bolts to conf

Seite 7

Maintenance | 15 Service Procedures For the steps to return a system or system component to ETS-Lindgren for service, see the Product Information

Seite 8

16 | Maintenance This page intentionally left blank.

Seite 9 - 1.0 Introduction

Specifications | 17 3.0 Specifications Electrical Specifications Voltage: 220 VAC Amp: 5.0 Line Frequency: 50/60 Hz Phase: Single Physical Spec

Seite 10

18 | Specifications This page intentionally left blank.

Seite 11 - NON-BORESIGHT FUNCTION

Electrical Installation | 19 4.0 Electrical Installation Before installing any components, follow the safety information in the ETS-Lindgren P

Seite 12 - ADDITIONAL FIBER OPTIC CABLE

ii | ETS-Lindgren Inc. reserves the right to make changes to any products herein to improve functioning or design. Although the information in

Seite 13 - 2.0 Maintenance

20 | Electrical Installation Connecting the Positioning Controller EMCENTER RF MODULAR PLATFORM The ETS-Lindgren EMCenter™ Modular RF Platform

Seite 14 - , 2171B/2170B

Assembly Instructions | 21 5.0 Assembly Instructions Before connecting any components, follow the safety information in the ETS-Lindgren Produ

Seite 15 - Maintenance

22 | Assembly Instructions Recommended Tools  300 mm adjustable wrench  3/16-in Allen wrench  9/16-in wrench  11/15-in wrench  Work b

Seite 16 - 16

Assembly Instructions | 23 Orientation of Parts during Assembly MAST ORIENTATION The fiber optic connectors are located on the front of the mast.

Seite 17 - ° per second

24 | Assembly Instructions BASE ORIENTATION

Seite 18 - 18

Assembly Instructions | 25 Assembly Steps TAKE CARE TO AVOID DAMAGE TO FIBER OPTIC CABLES: Never pull, pinch, bend, twist, or place any kind of

Seite 19

26 | Assembly Instructions Make sure to orient the carrier and mast as shown in Orientation During Assembly on page 23 STEP 3—SLIDE CARRIER ON

Seite 20 - EMCENTER RF MODULAR PLATFORM

Assembly Instructions | 27 STEP 4—BEGIN BELT INSTALLATION Remove the belt clamp plate by removing the four hex nuts. With the teeth facing inward

Seite 21 - 5.0 Assembly Instructions

28 | Assembly Instructions Route the belt to the top of the mast, over the pulleys, and down the other side of the mast. Remove the four hex

Seite 22 - Boresight shown;

Assembly Instructions | 29 Thread the belt over the timing pulley. Replace the plate and four hex nuts to keep the belt in place while you move

Seite 23 - CARRIER ORIENTATION

| iii Table of Contents Notes, Cautions, and Warnings ... vii 1.0 Introducti

Seite 24 - BASE ORIENTATION

30 | Assembly Instructions Make sure to orient the carrier and mast to the base as shown in Orientation During Assembly on page 23. STEP 5—INS

Seite 25

Assembly Instructions | 31 TAKE CARE TO AVOID DAMAGE TO FIBER OPTIC CABLES: Never pull, pinch, bend, twist, or place any kind of stress on the f

Seite 26

32 | Assembly Instructions

Seite 27

Assembly Instructions | 33 STEP 7—ADJUST THE TIMING Remove the four hex nuts and the timing pulley plate. To adjust the timing between the boresi

Seite 28

34 | Assembly Instructions  Roll the pulley to engage the teeth and then pull the belt up, taking care to keep slack out of the lower section

Seite 29

Assembly Instructions | 35 STEP 8—FINISH INSTALLING THE BELT Four cam followers are located on the underside of the base next to motor base pull

Seite 30 - STEP 5—INSERT MAST INTO BASE

36 | Assembly Instructions Reach under the base to access and remove the four cam followers with an Allen wrench. View of two cam followers r

Seite 31

Assembly Instructions | 37 View of motor base pulley with cam followers removed. With teeth facing inward, continue routing the belt down, aroun

Seite 32

38 | Assembly Instructions Finish installing the belt by attaching it to the lower belt clamp. Remove the two hex nuts. Remove small plate.

Seite 33 - STEP 7—ADJUST THE TIMING

Assembly Instructions | 39 With the teeth facing inward, place the belt between the posts and in the lower belt clamp, and then all the slack ou

Seite 34

iv | Carrier Orientation ... 23 Base Orienta

Seite 35

40 | Assembly Instructions STEP 9—ADJUST BELT TENSION  Tighten nut located at top of upper belt clamp.  Tension the belt until it is snug o

Seite 36

Additional Installation and Adjustments | 41 6.0 Additional Installation and Adjustments Install Cable Antenna 1. Feed the antenna cable into

Seite 37

42 | Additional Installation and Adjustments 3. Insert the offset boom into the end of the Model 2171B/2170B boom. 4. Tighten the three knobs

Seite 38 - Remove small plate

Additional Installation and Adjustments | 43 Install Boresight Links and Level Carrier (2171B Only) Install only one set of boresight links at a

Seite 39

44 | Additional Installation and Adjustments LEVEL CARRIER Place a level gauge on the carrier boom, rotate the cam pin knob until the carrier i

Seite 40 - STEP 9—ADJUST BELT TENSION

Additional Installation and Adjustments | 45 Install Non-Boresight Links and Level Carrier (2171B Only) Never operate the Model 2171B with bores

Seite 41

46 | Additional Installation and Adjustments This page intentionally left blank.

Seite 42

Operation | 47 7.0 Operation Before placing into operation, follow the safety information in the ETS-Lindgren Product Information Bulletin inc

Seite 43 - INSTALL BORESIGHT LINKS

48 | Operation Air Polarization Operation Prior to using air polarization, make sure that when the antenna polarizes that it turns freely, avo

Seite 44 - LEVEL CARRIER

Operation | 49 Infrared Remote Controller The Model 2171B/2170B Antenna Positioning Tower is infrared compatible, and can be used with a universa

Seite 45 - INSTALL NON-BORESIGHT LINKS

| v 118200: Model 2171B Tower Assembly ... 59 118623: Model 2170B Carrier Assemb

Seite 46

50 | Operation EDIT CONFIGURATION PARAMETERS Key Function PARAM To edit a configuration parameter:  Press PARAM key to display the current p

Seite 47 - 7.0 Operation

Operation | 51 TOWER ENCODER CALIBRATION Parameter C must be set to 2000 for the Model 2171B/2170B. Parameter C, the encoder calibration paramet

Seite 48

52 | Operation SHUTDOWN Move the carrier to an accessible height to remove the antenna and confirm the unit has come to a complete stop. Press

Seite 49

Operation | 53 BOOM LOAD LIMITATIONS Boom loading at 25 ft lb (33.9 Nm) measured along the boom from the mast.

Seite 50 - DIT CONFIGURATION PARAMETERS

54 | Operation This page intentionally left blank.

Seite 51 - START-UP

Warranty | 55 Appendix A: Warranty See the Product Information Bulletin included with your shipment for the complete ETS-Lindgren warranty for

Seite 52 - SHUTDOWN

56 | Warranty This page intentionally left blank.

Seite 53 - BOOM LOAD LIMITATIONS

EC Declaration of Conformity | 57 Appendix B: EC Declaration of Conformity

Seite 54 - 54

58 | EC Declaration of Conformity This page intentionally left blank.

Seite 55 - Appendix A: Warranty

Drawings | 59 Appendix C: Drawings The following drawings are located in the pocket of the back cover of the manual: 118100: MODEL 2171B CARRIE

Seite 56 - 56

vi | This page intentionally left blank.

Seite 57

AA10223331583047 48 50 49622429296677762531362620776576645176631117223974757336717213243764576 537676 4686152 21556059119614 & 1196133439828 46 44

Seite 58

DDVIEW A-A1220195141384476 314184032C CSECTION C-C62479693330SECTION D-D707067 42423368 541:4118100C2 2REF DRAWINGDO NOT SCALE DRAWINGSIZE PERMISSION

Seite 59 - Appendix C: Drawings

4884192.30 22792314341381224314324233334627368MAST HIDDEN FOR CLARITYF.O. CABLES EXIT HERE.ATTACH CONVOLUTEDTUBE W/BLACK TIE WRAPSAND ROUTE THROUGH M

Seite 60 - ETS LINDGREN

442047 5740 39 423235575933433136 5751 5848 57283457 494119 55 54 45 574657 52 5325308?17162936 574857944 20384121237 27 134857267 10 242311 19 182156

Seite 61 - PROPRIETARY INFORMATION

AB11 2863029141213529 2 7935 37 27 2754EPOXY85EPOXY173425 20 211034 3642223DETAIL A SCALE 1 : 42333 27 37DETAIL B SCALE 1 : 4202624 26 1837 930688NUT,

Seite 62

| vii Notes, Cautions, and Warnings Note: Denotes helpful information intended to provide tips for better use of the product. Caution: Denotes

Seite 63

viii | Introduction This page intentionally left blank.

Seite 64

Introduction | 9 1.0 Introduction The ETS-Lindgren Model 2171B/2170B Antenna Positioning Tower meets ANSI C63.4 requirements for measurements ab

Kommentare zu diesen Handbüchern

Keine Kommentare