Model 2171B / 2170B Antenna Positioning Tower User Manual Model 2171B boresight
10 | Introduction ETS-Lindgren Patented Boresight System The Model 2171B provides the ETS-Lindgren patented boresight system to provide direct
Introduction | 11 NON-BORESIGHT FUNCTION Positioning Controller (Required) A positioning controller, such as the ETS-Lindgren EMCenter™ Modular R
12 | Introduction Fiber Optic Control Cables: 3- and 10-meter Fiber Optic Shield Room Penetration Kit: Routes the fiber optic control cab
Maintenance | 13 2.0 Maintenance Before performing any maintenance, follow the safety information in the ETS-Lindgren Product Information Bull
14 | Maintenance Maintenance Schedule EVERY THREE MONTHS Inspect belt for wear, tension, and cracking. Check all screws and bolts to conf
Maintenance | 15 Service Procedures For the steps to return a system or system component to ETS-Lindgren for service, see the Product Information
16 | Maintenance This page intentionally left blank.
Specifications | 17 3.0 Specifications Electrical Specifications Voltage: 220 VAC Amp: 5.0 Line Frequency: 50/60 Hz Phase: Single Physical Spec
18 | Specifications This page intentionally left blank.
Electrical Installation | 19 4.0 Electrical Installation Before installing any components, follow the safety information in the ETS-Lindgren P
ii | ETS-Lindgren Inc. reserves the right to make changes to any products herein to improve functioning or design. Although the information in
20 | Electrical Installation Connecting the Positioning Controller EMCENTER RF MODULAR PLATFORM The ETS-Lindgren EMCenter™ Modular RF Platform
Assembly Instructions | 21 5.0 Assembly Instructions Before connecting any components, follow the safety information in the ETS-Lindgren Produ
22 | Assembly Instructions Recommended Tools 300 mm adjustable wrench 3/16-in Allen wrench 9/16-in wrench 11/15-in wrench Work b
Assembly Instructions | 23 Orientation of Parts during Assembly MAST ORIENTATION The fiber optic connectors are located on the front of the mast.
24 | Assembly Instructions BASE ORIENTATION
Assembly Instructions | 25 Assembly Steps TAKE CARE TO AVOID DAMAGE TO FIBER OPTIC CABLES: Never pull, pinch, bend, twist, or place any kind of
26 | Assembly Instructions Make sure to orient the carrier and mast as shown in Orientation During Assembly on page 23 STEP 3—SLIDE CARRIER ON
Assembly Instructions | 27 STEP 4—BEGIN BELT INSTALLATION Remove the belt clamp plate by removing the four hex nuts. With the teeth facing inward
28 | Assembly Instructions Route the belt to the top of the mast, over the pulleys, and down the other side of the mast. Remove the four hex
Assembly Instructions | 29 Thread the belt over the timing pulley. Replace the plate and four hex nuts to keep the belt in place while you move
| iii Table of Contents Notes, Cautions, and Warnings ... vii 1.0 Introducti
30 | Assembly Instructions Make sure to orient the carrier and mast to the base as shown in Orientation During Assembly on page 23. STEP 5—INS
Assembly Instructions | 31 TAKE CARE TO AVOID DAMAGE TO FIBER OPTIC CABLES: Never pull, pinch, bend, twist, or place any kind of stress on the f
32 | Assembly Instructions
Assembly Instructions | 33 STEP 7—ADJUST THE TIMING Remove the four hex nuts and the timing pulley plate. To adjust the timing between the boresi
34 | Assembly Instructions Roll the pulley to engage the teeth and then pull the belt up, taking care to keep slack out of the lower section
Assembly Instructions | 35 STEP 8—FINISH INSTALLING THE BELT Four cam followers are located on the underside of the base next to motor base pull
36 | Assembly Instructions Reach under the base to access and remove the four cam followers with an Allen wrench. View of two cam followers r
Assembly Instructions | 37 View of motor base pulley with cam followers removed. With teeth facing inward, continue routing the belt down, aroun
38 | Assembly Instructions Finish installing the belt by attaching it to the lower belt clamp. Remove the two hex nuts. Remove small plate.
Assembly Instructions | 39 With the teeth facing inward, place the belt between the posts and in the lower belt clamp, and then all the slack ou
iv | Carrier Orientation ... 23 Base Orienta
40 | Assembly Instructions STEP 9—ADJUST BELT TENSION Tighten nut located at top of upper belt clamp. Tension the belt until it is snug o
Additional Installation and Adjustments | 41 6.0 Additional Installation and Adjustments Install Cable Antenna 1. Feed the antenna cable into
42 | Additional Installation and Adjustments 3. Insert the offset boom into the end of the Model 2171B/2170B boom. 4. Tighten the three knobs
Additional Installation and Adjustments | 43 Install Boresight Links and Level Carrier (2171B Only) Install only one set of boresight links at a
44 | Additional Installation and Adjustments LEVEL CARRIER Place a level gauge on the carrier boom, rotate the cam pin knob until the carrier i
Additional Installation and Adjustments | 45 Install Non-Boresight Links and Level Carrier (2171B Only) Never operate the Model 2171B with bores
46 | Additional Installation and Adjustments This page intentionally left blank.
Operation | 47 7.0 Operation Before placing into operation, follow the safety information in the ETS-Lindgren Product Information Bulletin inc
48 | Operation Air Polarization Operation Prior to using air polarization, make sure that when the antenna polarizes that it turns freely, avo
Operation | 49 Infrared Remote Controller The Model 2171B/2170B Antenna Positioning Tower is infrared compatible, and can be used with a universa
| v 118200: Model 2171B Tower Assembly ... 59 118623: Model 2170B Carrier Assemb
50 | Operation EDIT CONFIGURATION PARAMETERS Key Function PARAM To edit a configuration parameter: Press PARAM key to display the current p
Operation | 51 TOWER ENCODER CALIBRATION Parameter C must be set to 2000 for the Model 2171B/2170B. Parameter C, the encoder calibration paramet
52 | Operation SHUTDOWN Move the carrier to an accessible height to remove the antenna and confirm the unit has come to a complete stop. Press
Operation | 53 BOOM LOAD LIMITATIONS Boom loading at 25 ft lb (33.9 Nm) measured along the boom from the mast.
54 | Operation This page intentionally left blank.
Warranty | 55 Appendix A: Warranty See the Product Information Bulletin included with your shipment for the complete ETS-Lindgren warranty for
56 | Warranty This page intentionally left blank.
EC Declaration of Conformity | 57 Appendix B: EC Declaration of Conformity
58 | EC Declaration of Conformity This page intentionally left blank.
Drawings | 59 Appendix C: Drawings The following drawings are located in the pocket of the back cover of the manual: 118100: MODEL 2171B CARRIE
vi | This page intentionally left blank.
AA10223331583047 48 50 49622429296677762531362620776576645176631117223974757336717213243764576 537676 4686152 21556059119614 & 1196133439828 46 44
DDVIEW A-A1220195141384476 314184032C CSECTION C-C62479693330SECTION D-D707067 42423368 541:4118100C2 2REF DRAWINGDO NOT SCALE DRAWINGSIZE PERMISSION
4884192.30 22792314341381224314324233334627368MAST HIDDEN FOR CLARITYF.O. CABLES EXIT HERE.ATTACH CONVOLUTEDTUBE W/BLACK TIE WRAPSAND ROUTE THROUGH M
442047 5740 39 423235575933433136 5751 5848 57283457 494119 55 54 45 574657 52 5325308?17162936 574857944 20384121237 27 134857267 10 242311 19 182156
AB11 2863029141213529 2 7935 37 27 2754EPOXY85EPOXY173425 20 211034 3642223DETAIL A SCALE 1 : 42333 27 37DETAIL B SCALE 1 : 4202624 26 1837 930688NUT,
| vii Notes, Cautions, and Warnings Note: Denotes helpful information intended to provide tips for better use of the product. Caution: Denotes
viii | Introduction This page intentionally left blank.
Introduction | 9 1.0 Introduction The ETS-Lindgren Model 2171B/2170B Antenna Positioning Tower meets ANSI C63.4 requirements for measurements ab
Kommentare zu diesen Handbüchern